| A. Product Planning / Evaluation |
| a) |
Product Planning |
| b) |
Research & Development |
| c) |
Evaluation & Approval
of the Product by Aviation Authority and/or by the customer through
Qualification testing for each tire size. |
 |
| B. Control of Mass-Production |
| a) |
Establishing Standards |
| b) |
Control of Initial Product
in Advance of Mass Production |
| c) |
Process Assurance
Characteristics are classified into inspection points, control points
and check points for each manufacturing process. |
| d) |
Lot-Control System
Pursuit of raw-materials history and adoption of a process inspection
card system. |
| e) |
Control Test |
 |
| C. Inspection |
| a) |
Acceptance of raw materials
registration of the specified suppliers |
| b) |
Inspection |
| c) |
Inspection in process
Adoption of a process inspection card system |
| d) |
Final product inspection |
| e) |
Material-Review-Board System |
 |
| D. Packing, Storage and
Transportation |
 |
| E. Control over Jigs and
Tools, Instruments, Facilities and Machinery |
 |
| F. Examination and Analysis
of Claimed Tires |
 |
| G. Custody of records |